OCTOBER 2016
Work has commenced on the piling works on the Sandgross shopping mall.
The job consists of 1,445 points of 350mm x 350mm pre-cast concrete piles to be driven to depths of 36m.
Designed by Amarch Consultants (Architectural) , Structural Engineering Consultants are Ovie Arup.