Loading...

SLOANE COURT PROJECT, YABA LAGOS: PILE DRIVING (LESS THAN 5M TO AN EXISTING WALL)

Niyod Construction just concluded the production and installation of 18 Nos. 350mm x 350mm pre-cast concrete driven piles to an average depth of 28m at Alagomeji, Yaba, Lagos.
The Project Managers are Fredrick Roberts Construction Limited.
The Structural Engineers are FAY And Associates.

Pile driving operations
Pile driving operations
Pile driving operations
Pile driving operations
Dynamic load testing in progress
PROJECTS 1840055673350416061

Post a Comment

emo-but-icon

Home item